Project Value
$2.2M
- Construction of a 2m wide concrete footpath and kerb ramps
- Drainage works that include but not limited to installation of multiple new stormwater gully pits
- Installation/replacement of multiple stormwater pipes, field inlet pits and stormwater headwalls
- Construction of elevated boardwalks at three different locations
- Construction of flattop pedestrian crossing and pram ramps
- Supply and connection of multiple electrical works
- Installation of turf and batter stabilisation works
- Supply and install of streetscape furniture
- 12 month maintenance of project.