![Caboolture to Wamuran Rail Trail Sign](https://www.tlcc.net.au/wp-content/uploads/2019/09/TLCC-Project-Wamuran-Rail-Trail-Stage-1-MBRC-1.jpg)
Project Value
$1.5M
- Site establishment, including installation of environmental controls
- Demolition and re-purposing of existing infrastructure
- Installation of tree protection measures & site drainage
- Earthworks and site levelling,
- Street furniture, drinking fountains and bollards
- Construction of feature shelters, signage trail markers
- Construction of bridge crossings and associated fencing works
- New soils and mulch, turfing and mass plantings
- Hydromulching
- Installation of electrical conduits, CCTV and lighting
- Extensive concrete pavement construction.
![bike racks, seating and car park](https://www.tlcc.net.au/wp-content/uploads/2019/09/TLCC-Project-Wamuran-Rail-Trail-Stage-1-MBRC4.jpg)
![seating](https://www.tlcc.net.au/wp-content/uploads/2019/09/TLCC-Project-Wamuran-Rail-Trail-Stage-1-MBRC5.jpg)
![wide footpath](https://www.tlcc.net.au/wp-content/uploads/2019/09/TLCC-Project-Wamuran-Rail-Trail-Stage-1-MBRC3.jpg)
![Caboolture to Wamuran Rail Trail sign on wall](https://www.tlcc.net.au/wp-content/uploads/2019/09/TLCC-Project-Wamuran-Rail-Trail-Stage-1-MBRC2.jpg)