By Logan City Council

Logan, QLD

As part of Logan City Council’s commitment to developing Springwood’s centre as a major commercial hub, TLCC was engaged to deliver key aspects of a new three-metre wide active transport link that forms part of a pedestrian and cycle loop designed to improve connectivity within Springwood. The project will improve safety and walkability for local residents, students and employees by linking retail and commercial areas.

Project Value $500k
  • Pcbu
  • Site preliminaries
  • Site survey
  • Tree management plan, environmental management plan, safety management plan.
  • Demolition of existing structures (including asbestos removal)
  • Site preparation and earthworks
  • Drainage (civil and landscape)
  • Timber decking and ramps
  • Street and garden furniture
  • Landscape soils and mulches
  • Plants and turf
  • Decorative pedestrian and trafficable concrete pavements
  • Kerb and channel
  • Asphalt pavements
  • Concrete sleeper retaining walls
  • Handrails and balustrades
  • Concrete garden edging
  • Tactiles
  • Electrical and lighting
  • As constructed documentation
  • Handover user manuals
  • Landscape establishment and maintenance

Thoughtful design and execution ensure maximum enjoyment and usability for Springwood residents.