Project Value
380K
- Principal Contractor (PCUB)
- Site Preliminaries
- Tree Management Plan, Environmental Management Plan, Safety Management Plan.
- Demolition
- Site Preparation and Earthworks
- Drainage
- Paving
- Concrete Stairs
- Decomposed Granite pathways (stabilised)
- Rubber soft fall
- Mulch soft fall
- Large boulders
- River pebble
- Timber totem poles
- Timber edging
- Concrete edging
- Root barrier
- Landscape soils and mulches
- Plants and turf
- Bench seating
- Playground equipment
- As Constructed documentation
- Handover User Manuals
- Landscape Establishment and maintenance
![Nature Play Gilston Park playground construction project on the Gold Coast by TLCC](https://www.tlcc.net.au/wp-content/uploads/2020/01/Gilton-2.jpg)
![Nature Play Gilston Park playground construction project on the Gold Coast by TLCC](https://www.tlcc.net.au/wp-content/uploads/2020/01/Gilton-3.jpg)
![Nature Play Gilston Park playground construction project on the Gold Coast by TLCC](https://www.tlcc.net.au/wp-content/uploads/2020/01/Gilton-1.jpg)