![](https://www.tlcc.net.au/wp-content/uploads/2021/11/TLCC-EGW-Wood-Park-5-1.jpg)
Project Value
$410K
- Site establishment
- Site security (after hours)
- Site survey
- Environmental management plan
- Safety management plan
- Service locations
- Dilapidation survey
- Site preparation and earthworks
- Quality assurance, inspections and testing
- Drainage
- Water services
- Shade structures
- Street and garden furniture
- Landscape soils and mulches
- Plants and turf
- Synthetic turf
- Concrete pedestrian pathways
- Gravel pavements and AC surfacing
- As constructed documentation and certification
- Handover user manuals
- Landscape establishment and maintenance
![](https://www.tlcc.net.au/wp-content/uploads/2021/11/TLCC-EGW-Wood-Park-4-1.jpg)
A new BMX track has riders pumped at Wellington Point
![](https://www.tlcc.net.au/wp-content/uploads/2021/11/TLCC-EGW-Wood-Park-3-1.jpg)
![](https://www.tlcc.net.au/wp-content/uploads/2021/11/TLCC-EGW-Wood-Park-2-1.jpg)
![](https://www.tlcc.net.au/wp-content/uploads/2021/11/TLCC-EGW-Wood-Park-1-1.jpg)